Methodology

Six steps, from the first conversation to handing the installation over to your teams.

The six steps

  1. Scoping

    Understand the site, constraints and goal. Define what is in scope and what is not.

    Deliverable: Scoping note

  2. Study

    Site survey, analysis of existing systems, technical options and costing.

    Deliverable: Study report

  3. Design

    Diagrams, functional analysis and equipment selection.

    Deliverable: Design file

  4. Integration

    Build, wiring, programming and configuration.

    Deliverable: Installation ready for testing

  5. Testing

    Workshop tests, then on-site tests, following a written protocol.

    Deliverable: Test report

  6. Handover

    Team training, documentation and acceptance.

    Deliverable: Acceptance file

How this links to our project statuses

The statuses on our project sheets follow these steps: a study can become a prototype, then a pilot. A project is called “deployed” only once the acceptance file is signed.

Start with scoping

Scoping sets what is included, what is not and the expected deliverables.